On May 5th, the ship Supramax MV Seacon Dalian left Enseada with navigation draft of 11.09 meters carrying iron ore bound for China with 44,800 MT onboard.
The ship was loaded in two days with 25,000t/day speed rate.
This is the 35° iron ore loading operation at ENSEADA Private Port successfully executed
On May 5th, the ship Supramax MV Seacon Dalian left Enseada with navigation draft of 11.09 meters carrying iron ore bound for China with 44,800 MT onboard.
Share This Story, Choose Your Platform!
Related Posts
-
On February 24th, the Supramax ship MV Thor Caliber left Enseada with a draft of 11.09 meters bound for Europe carrying 47,300 tons of iron ore from the client Tombador Iron. Gallery
On February 24th, the Supramax ship MV Thor Caliber left Enseada with a draft of 11.09 meters bound for Europe carrying 47,300 tons of iron ore from the client Tombador Iron.
-
No dia 12 de fevereiro, o navio Ultramax MV Ultralaz deixou o Enseada com calado de 11,31 metros com destino à Europa carregando 50.000 t de minério de ferOn February 12 th, the Ultramax ship MV Ultralaz left Enseada with a draft of 11 31 meters bound for Europe carrying 50 000 tons of iron ore from the client Tombador Ironro do cliente Tombador Iron Gallery
No dia 12 de fevereiro, o navio Ultramax MV Ultralaz deixou o Enseada com calado de 11,31 metros com destino à Europa carregando 50.000 t de minério de ferOn February 12 th, the Ultramax ship MV Ultralaz left Enseada with a draft of 11 31 meters bound for Europe carrying 50 000 tons of iron ore from the client Tombador Ironro do cliente Tombador Iron