Start of port operations at the Enseada Terminal

/, Notícias/Start of port operations at the Enseada Terminal

Start of port operations at the Enseada Terminal

Today the ship Supramax Athena left ENSEADA with a navigation draft of 11 meters, carrying 44,000 tons of iron ore bound for china.

The ship was loaded with the 4 onboard cranes operating simultaneously in just 60 hours, resulting in an ore transfer rate 50% higher than planned.

The success of the operation result in an anticipation of the schedule for the customer and a reduction in freight costs.

Approximately 1,100 trucks loaded with ore have been received in the past 4 weeks.

By |2020-09-08T14:52:33-03:00September 8th, 2020|Eventos, Notícias|0 Comments

This will close in 0 seconds